Foam Trimmed for Membrane Install
Step 7: After the foam has fully cured, return to the project and clean up the area. Trim any excess foam and smooth out the transition between the patched square and the surrounding dome surface. This will help ensure a good seal when you patch the membrane.
Image by Mike South
Sourced from Monolithic Commons
Posted to Safety Starts at the Top: Anchor Points Make Dome Maintenance Easy
Download image
Original (5281×3521) / Huge (1920×1280) / Large (1600×1066) / Medium (1280×853) / Small (960×640) / Thumb (640×426)
Generated Attribution [ Copy HTML ]
Image by Mike South from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)