Foam Trimmed for Membrane Install.

Foam Trimmed for Membrane Install

Step 7: After the foam has fully cured, return to the project and clean up the area. Trim any excess foam and smooth out the transition between the patched square and the surrounding dome surface. This will help ensure a good seal when you patch the membrane.

Image by Mike South

Sourced from Monolithic Commons

Posted to Safety Starts at the Top: Anchor Points Make Dome Maintenance Easy

CC BY-SA 4.0

Download image

Original (5281×3521) / Huge (1920×1280) / Large (1600×1066) / Medium (1280×853) / Small (960×640) / Thumb (640×426)

Generated Attribution [ Copy HTML ]

Image by Mike South from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)