They applied a concrete layer over the scale model’s earth mound. After it cured, they excavated the earth and then load-tested the finished model to failure. These tests proved the design and prepared the project for full-scale construction.
Image by Courtesy of Arnold Wilson
Posted to Raising and Razing Ream's Turtle
All Rights Reserved