Gym floor.

Gym floor.

January 3, 2002 – The gymnasium floor nears its completion. IHS Multipurpose dome will feature a “Boston Square” floor pattern. The dome shell has been painted black which provides a beautiful background for lighting.

Image by David Collins

Sourced from Monolithic Commons

Posted to Italy High School Gymnasium Construction Photo Journal

CC BY-SA 4.0

Download image

Original (1704×2122) / Huge (1704×2122) / Large (1600×1992) / Medium (1280×1593) / Small (960×1195) / Thumb (640×796)

Generated Attribution [ Copy HTML ]

Image by David Collins from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)