Gym floor.
January 3, 2002 – The gymnasium floor nears its completion. IHS Multipurpose dome will feature a “Boston Square” floor pattern. The dome shell has been painted black which provides a beautiful background for lighting.
Image by David Collins
Sourced from Monolithic Commons
Posted to Italy High School Gymnasium Construction Photo Journal
Download image
Original (1704×2122) / Huge (1704×2122) / Large (1600×1992) / Medium (1280×1593) / Small (960×1195) / Thumb (640×796)
Generated Attribution [ Copy HTML ]
Image by David Collins from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)