Panorama of nearly finished interior.
January 2002 – Panoramic view. Multipurpose building will feature a full-size basketball court and also be used for volleyball, pep rallies, graduations, band performances, physical education classes, and more. The hung ceiling contributes to better acoustics in the facility. The upper seating is complete. Workers construct the retractable bleachers on the floor. The interior also nears completion. The estimated completion is Jan. 15, 2002.
Image by David Collins
Sourced from Monolithic Commons
Posted to Italy High School Gymnasium Construction Photo Journal
Download image
Original (5362×2104) / Huge (1920×753) / Large (1600×627) / Medium (1280×502) / Small (960×376) / Thumb (640×251)
Generated Attribution [ Copy HTML ]
Image by David Collins from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)