The Square for the Anchor Point is Almost Ready
Step 3: Once the foam is fully removed, the structural concrete will be exposed. Take a moment to clear away any remaining bits of foam so you have a clean surface for the next step.
Image by Mike South
Sourced from Monolithic Commons
Posted to Safety Starts at the Top: Anchor Points Make Dome Maintenance Easy
Download image
Original (2043×1361) / Huge (1920×1279) / Large (1600×1065) / Medium (1280×852) / Small (960×639) / Thumb (640×426)
Generated Attribution [ Copy HTML ]
Image by Mike South from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)