Preparing to Frame Augments.

Preparing to Frame Augments

Interior shot of the main dome from the connection tunnel. Airform fabric is translucent, so even before we turn on construction lights, you can actually see pretty well when you’re inside. On the floor, the parts to our Paxis Polar Scaffold are ready to be assembled. Soon we’ll start framing out the augments, and then we’ll be ready to foam.