Reconstruction progress with sheathing, flashing, and wallboard

Zip System sheathing and metal flashing applied (left), the 3/8-inch rain-screen applied (middle), and the Hardie Panel plus Schluter tile edging — temporarily taped down — and paintable silicone caulk applied (right)

Ben Erwin