November 2001 – Panoramic view of the hung ceiling, scoreboard, upper-level guardrail, and concrete foundation for seating.
Image by David Collins
Sourced from Monolithic Commons
Posted to Italy High School Gymnasium Construction Photo Journal
CC BY-SA 4.0
Download image
Original (2751×1198) / Huge (1920×836) / Large (1600×696) / Medium (1280×557) / Small (960×418) / Thumb (640×278)
Generated Attribution [ Copy HTML ]
Image by David Collins from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)