February 24, 2001 – The Airform membrane is attached and the 148-foot dome structure is fully inflated. Work continues inside.
Image by David Collins
Sourced from Monolithic Commons
Posted to Italy High School Gymnasium Construction Photo Journal
CC BY-SA 4.0
Download image
Original (1920×1255) / Huge (1920×1255) / Large (1600×1045) / Medium (1280×836) / Small (960×627) / Thumb (640×418)
Generated Attribution [ Copy HTML ]
Image by David Collins from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)