Stem wall rebar.

February 7, 2001 – The initial layer of concrete is applied and horizontal and vertical rebar is put in place. The depth gauges show the potential thickness of the dome wall.

Image by David Collins

Posted to Italy High School Gymnasium Construction Photo Journal

© All Rights Reserved