Footing prep.

Footing prep.

January 22, 2001 – Footing preparations for the 148-foot multipurpose building.

Image by David Collins

Sourced from Monolithic Commons

Posted to Italy High School Gymnasium Construction Photo Journal

CC BY-SA 4.0

Download image

Original (1920×1080) / Huge (1920×1080) / Large (1600×900) / Medium (1280×720) / Small (960×540) / Thumb (640×360)

Generated Attribution [ Copy HTML ]

Image by David Collins from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)