October 2001 – The scissor lift is extended to build the catwalk at the dome’s top. The HVAC system can be accessed by the catwalk and is covered by a hung ceiling.
Image by David Collins
Posted to Italy High School Gymnasium Construction Photo Journal
© All Rights Reserved