Ticket booth and entryway.

July 4, 2001 – Exterior addition of the ticket booth and entryway. This was done with the spray-in-place process and a poured concrete ceiling.

Image by David Collins

Posted to Italy High School Gymnasium Construction Photo Journal

© All Rights Reserved