Consulting, Creating, Constructing
Step by step, the Monolithic Dome formed on Maui. First came the inflated Airform membrane. Then, inside the inflated membrane, the scaffolding was set up on the rotating scaffold base. Next, workers attached steel rebar to the applied polyurethane foam, and then finished the concrete shell.
Image by HDomes Consultation & Construction
Sourced from Submitted Media
Posted to Humpback Whales Frolic in 3D Dome Experience at Maui Ocean Center