Second Mat of Steel.

Second Mat of Steel

A second mat of reinforcement was required at the top of the dome to help support and distribute the weight of the conveyance equipment that will rest on the top of the building. We spray and embed the first layer of rebar to ensure that it is well encapsulated, then install the second mats. Paxis scaffolding provides an excellent building platform.