Frost Footing Pour.

Frost Footing Pour

This is the first phase of footing construction. We dig a 4’ deep trench to be below frost depth. After the trench is dug, we immediately fill that with non-reinforced concrete. This will ensure that we don’t cave in the trench while forming and reinforcing the structural footing.