The outside of the Avalon gym looks complete.
September 27, 2002 – From the outside, the Avalon Multipurpose Center gymnasium looks complete. Inside, work continues with adding fixtures, staining the floor, and more. Everything is ahead of schedule and the gym may open as early as November — two months early.
Image by Dave South
Posted to Avalon High School Gymnasium Construction Photo Journal
© All Rights Reserved