A scaffold in place to start installing the scoreboard to the drop ceiling.

September 23, 2002 – With the drop ceiling tiles, lights, HVAC ductwork (above and out of sight), in place, work begins on installing the scoreboard.

Image by Dave South

Posted to Avalon High School Gymnasium Construction Photo Journal

© All Rights Reserved