Scaffold to Install Central Scoreboard.

Scaffold to Install Central Scoreboard

September 23, 2002—With the drop ceiling tiles, lights, HVAC ductwork (above and out of sight), in place, work begins on installing the scoreboard.

Image by Dave South

Sourced from Monolithic Commons

Posted to Avalon High School Gymnasium Construction Photo Journal

CC BY-SA 4.0

Download image

Original (2248×1264) / Huge (1920×1079) / Large (1600×899) / Medium (1280×719) / Small (960×539) / Thumb (640×359)

Generated Attribution [ Copy HTML ]

Image by Dave South from Monolithic Commons via Monolithic Dome Institute (CC BY-SA 4.0)